SMT EMI Shielding Can
Check pick-up geometry, pad contact and feeder packaging against the intended placement and reflow process.
View product
Manufacturing & Finishes
Define the base material, nickel coating and contact interfaces, with finished dimensions and inspection requirements stated.
Use the image as a design reference. The agreed drawing and sample define the supplied part.
DESIGN CONSIDERATIONS
DRAWINGS & REQUIREMENTS
Agree on the drawing, manufacturing route and sample scope first. Use the sample to check fit, assembly and the tests required by your project, then confirm the production drawing, inspection plan and packaging.
Samples are paid. Standard samples: 3–5 days. Expedited sampling: 48 hours. Tooling and sample production: 7–10 days. These are sample-stage timings and do not include mass-production delivery; availability and the schedule are confirmed for each project.
TOOLING & SAMPLE VALIDATION
Ruishuo makes tooling in-house, connecting die design and CAD/CAM simulation with stamping and inspection. The tooling route for your part is reviewed against the agreed drawing, material and assembly requirements.
The process route should support the geometry, material and required final condition of the part. Review cut features, bend positions and any surface-treatment requirements together, including the stage at which critical dimensions will be inspected. A process name alone does not establish the tooling design or the acceptance criteria for your shield.
Paid samples include a full dimensional inspection report. Ruishuo's inspection equipment includes 2.5D vision measurement systems, CMMs and profile projectors; measurement methods and any additional functional checks are selected for the project. Incoming, in-process and outgoing inspections support the agreed requirements as the part moves into production.