chinarswj@shieldingcover.comPrecision Metal Manufacturing
Product view: SMT EMI Shielding Can
SMT EMI Shielding Can · Product view

Manufacturing & Finishes

SMT EMI Shielding Can

Check pick-up geometry, pad contact and feeder packaging against the intended placement and reflow process.

Design review
Drawing and mating-part requirements
Material & finish
Specified for your project
Samples
Paid; process and timing agreed before work starts
Review inputs
2D/3D drawings or reference-part information

Use the image as a design reference. The agreed drawing and sample define the supplied part.

DESIGN CONSIDERATIONS

Define the manufacturing requirements

  • Describe pick-up and locating features on the drawing rather than relying on a process name.
  • Review pad layout and shield mounting faces against the material and assembly requirements.
  • Agree on reflow conditions and feeder packaging before sampling.

DRAWINGS & REQUIREMENTS

Inputs for a process review

  • The part drawing and the requirements for pick-up and locating features.
  • Known conditions and open design choices concerning pad layout and shield mounting faces.
  • Requirements for reflow conditions and feeder packaging, with quantity, packaging and sample scope.
Discuss this part with our team ↗

Sampling before production

Agree on the drawing, manufacturing route and sample scope first. Use the sample to check fit, assembly and the tests required by your project, then confirm the production drawing, inspection plan and packaging.

Samples are paid. Standard samples: 3–5 days. Expedited sampling: 48 hours. Tooling and sample production: 7–10 days. These are sample-stage timings and do not include mass-production delivery; availability and the schedule are confirmed for each project.

TOOLING & SAMPLE VALIDATION

Tooling decisions behind
SMT EMI Shielding Can.

Ruishuo makes tooling in-house, connecting die design and CAD/CAM simulation with stamping and inspection. The tooling route for your part is reviewed against the agreed drawing, material and assembly requirements.

Connect the forming route to the finished-part requirements.

The process route should support the geometry, material and required final condition of the part. Review cut features, bend positions and any surface-treatment requirements together, including the stage at which critical dimensions will be inspected. A process name alone does not establish the tooling design or the acceptance criteria for your shield.

  • Identify the material, formed features and required finished surface condition.
  • Define drawing datums and any mating dimensions that need sample validation.
  • Agree the inspection stage and relevant checks for the supplied part.

Use the sample report to close the drawing review.

Paid samples include a full dimensional inspection report. Ruishuo's inspection equipment includes 2.5D vision measurement systems, CMMs and profile projectors; measurement methods and any additional functional checks are selected for the project. Incoming, in-process and outgoing inspections support the agreed requirements as the part moves into production.

LET’S BUILD YOUR SHIELDING SOLUTION

Discuss your next shielding design
with our engineering team.

Share the geometry, materials and quantities. We’ll discuss the manufacturing options.

Discuss Your Project

Contact Ruishuo Metal on WeChat

Ruishuo Metal WeChat contact QR code

Scan with WeChat