chinarswj@shieldingcover.comPrecision Metal Manufacturing

Precision stamping for board-level components

Precision stamping is a core manufacturing process at Ruishuo Metal for custom shielding cans, frames and related components. Progressive-die options are assessed against the part features, material and production demand.

Before production, agree on more than the outline: critical dimensions, material revision, surface finish, inspection tasks and packaging all belong in the manufacturing specification.

Match the process to the geometry

Stamping and deep drawing are manufacturing processes. One-piece, two-piece and multi-cavity describe the structure or compartment arrangement. Define those separately, then review the feasible combinations.

Forming limits and dimensional requirements are established through drawings and approved samples. A process name alone does not establish the part's performance.

ProcessReview focus
Precision stampingHole locations, bends, frames, mating components and production quantities
Deep drawingSingle enclosures, depth, corners and material forming requirements
CNC samplesDimensional and assembly checks within the agreed sample scope
Surface finishingRequirements for soldering, contact and the operating environment

Develop tooling and inspection requirements together

Tooling design starts from the agreed drawing revision. Evaluate critical dimensions and mating relationships during the sample stage.

Drawing review

Establish the outline, holes, mating geometry, units and critical dimensions.

Tooling and samples

Select tooling or a sample process for the manufacturing route and check the agreed tasks.

Finish and recheck

Include material and surface finish in the approved revision, then recheck affected dimensions and assembly.

Packaging and shipment

Agree on packaging and outgoing inspection for the part geometry and customer feeding method.

Schedule samples by the agreed process

Sample fees apply. Standard samples take 3–5 days, expedited sampling 48 hours, and tooling and sample production 7–10 days. These sample-stage timelines exclude volume production and delivery and are scheduled against the confirmed plan.

After sample approval, set the volume production schedule around the order quantity, material, tooling, finish and packaging. Delivery milestones are confirmed with the order.

LET’S BUILD YOUR SHIELDING SOLUTION

Discuss your next shielding design
with our engineering team.

Share the geometry, materials and quantities. We’ll discuss the manufacturing options.

Discuss Your Project

Contact Ruishuo Metal on WeChat

Ruishuo Metal WeChat contact QR code

Scan with WeChat