Two-Piece EMI Shielding Can
Review frame-to-lid fit, contact areas and the space needed to remove the lid as part of the complete PCB assembly.
View product
Shield Designs
Bring both part drawings and the assembly view into the review. Confirm contact fit, access needs and the removal method together.
Use the image as a design reference. The agreed drawing and sample define the supplied part.
DESIGN CONSIDERATIONS
DRAWINGS & REQUIREMENTS
Agree on the drawing, manufacturing route and sample scope first. Use the sample to check fit, assembly and the tests required by your project, then confirm the production drawing, inspection plan and packaging.
Samples are paid. Standard samples: 3–5 days. Expedited sampling: 48 hours. Tooling and sample production: 7–10 days. These are sample-stage timings and do not include mass-production delivery; availability and the schedule are confirmed for each project.
TOOLING & SAMPLE VALIDATION
Ruishuo makes tooling in-house, connecting die design and CAD/CAM simulation with stamping and inspection. The tooling route for your part is reviewed against the agreed drawing, material and assembly requirements.
For a two-piece or removable shield, the tooling review includes the interface between the frame and lid. A lid that matches the nominal outline may still need adjustment at its engagement points. Sample review should therefore cover the assembled pair, with any removal and retention requirements agreed for the intended use.
Paid samples include a full dimensional inspection report. Ruishuo's inspection equipment includes 2.5D vision measurement systems, CMMs and profile projectors; measurement methods and any additional functional checks are selected for the project. Incoming, in-process and outgoing inspections support the agreed requirements as the part moves into production.