EMI Shielding Frame
Review the frame's PCB boundary and its mating lid together, including locating features and electrical contact requirements.
View product
Frames & Components
Match the lid to its frame or mounting interface. Review edge fit, removal space and the contact points as one assembly.
Use the image as a design reference. The agreed drawing and sample define the supplied part.
DESIGN CONSIDERATIONS
DRAWINGS & REQUIREMENTS
Agree on the drawing, manufacturing route and sample scope first. Use the sample to check fit, assembly and the tests required by your project, then confirm the production drawing, inspection plan and packaging.
Samples are paid. Standard samples: 3–5 days. Expedited sampling: 48 hours. Tooling and sample production: 7–10 days. These are sample-stage timings and do not include mass-production delivery; availability and the schedule are confirmed for each project.
TOOLING & SAMPLE VALIDATION
Ruishuo makes tooling in-house, connecting die design and CAD/CAM simulation with stamping and inspection. The tooling route for your part is reviewed against the agreed drawing, material and assembly requirements.
A shielding lid is an assembly component. Its tooling review should connect roof geometry and edge features to the actual frame it closes. Where the lid uses clips or formed engagement features, the drawing and sample review should identify those interfaces explicitly; the photograph alone cannot establish the fit or retention requirement.
Paid samples include a full dimensional inspection report. Ruishuo's inspection equipment includes 2.5D vision measurement systems, CMMs and profile projectors; measurement methods and any additional functional checks are selected for the project. Incoming, in-process and outgoing inspections support the agreed requirements as the part moves into production.